
Add to Cart
Tubular screw conveyors and feeders have a wide range of applications in powder and granular material handling. Depending on the material being transported, different types of conveyors and feeders can be selected, for example: concrete products (cement, fly ash, filler dust, dust), bituminous products (hot and cold process dust), building ready-mix materials (Dried lime, sand, cement, fillers), glass technology (limestone, soda ash, sand, etc.), foundry (sand, bentonite), etc.
Structure size:
Tubular screw conveyor includes welding end flange, feed port, discharge port, observation window below the feed port and middle hanging bearing, spiral blade welded on the center pipe, the end bearing assembly contains self-adjustment Shaft sealing equipment, splined bushings, and lifting eye for each pipe section. Spiral blade types are small in overall size, compact in size, and spare parts are less in number. Maintenance is easy to install.
Model number | LSY140 | LSY160 | LSY200 | LSY250 | LSY300 | LSY400 | ||
Screw diameter(mm) | 140 | 163 | 187 | 238 | 290 | 365 | ||
Rotating speed(r/min) | 300 | 300 | 260 | 200 | 175/300 | 175 | ||
Outer diameter(mm) | 168 | 194 | 219 | 273 | 325 | 402 | ||
Max length(m) | 11 | 12 | 13 | 16 | 18 | 18 | ||
Incline degree(α°) | 0°~60° | 0°~60° | 0°~60° | 0°~60° | 0°~55° | 0°~55° | ||
Conveying capacity(t/h) | 9月17日 | 30-20 | 50-32 | 70-53 | 82-60/120-85 | 140-110 | ||
Motor | Model | L≤-7 | Y132S-4 | Y132S-4 | Y132M-4 | Y160L-6 | Y180M-4 | Y180M-4 |
Power(kw) | 5.5 | 5.5 | 7.5 | 11 | 18.5 | 18.5 | ||
Model | L>7 | Y132S-4 | Y132M-4 | Y160M-4 | Y180L-6 | Y180L-4 | Y180L-4 | |
Power(kw) | 5.5 | 7.5 | 11 | 15 | 22 | 22 |
How to Select Correct Model Tube Screw Conveyor :
1. Are you a factory or a trading company
We are a factory,and you are warmlyh welcomed to pay an on-site visit!
2. What's the accepted payment term?
T/T L/C Western union,cash and so on.
3. Can you offer the customized solution to my case?
We have R&D team who will handle your case and come up with an ideal solution
4. How long is your lead time for the machines
Normally 20 workdays after the deposit is reached.Nonstandard equipments could be longer depends on certain case
5. Are you engineers available for overseas installation and training matters?
Yes,and all the relative costs should be covered by you
How to packing and delivery machine !!!
Usually packed with seaworthy wooden box packing and we can accepted customer sepical required .